Weld Procedures (WPS) are an important and necessary component of the welding QA package for all welding projects including those under 1554.1 in the structural steel industry. A welding procedure provides instructions for welders on the parameters required to produce a defect free and mechanically sound joint.
AS/NZS 1554: Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) documents prepared and/or approved for all parts (AS/NZS 1554.1 through to AS/NZS 1554.7) of the Australasian Structural Steels Standards by experienced qualified weld inspectors.
ASME IX: Weld Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance Qualification (WPQ) documents prepared and/or approved for the ASME IX Boiler and Pressure Vessel Code by experienced qualified weld inspectors.
Other: Weld Procedure Specification and Procedure Qualification Record documents prepared and/or approved for other codes and standards such as AS1665, AS/NZS3992, API1104, AS2885 (including specialised procedures for welding to live carriers in accordance with Section 13), and ISO15614 (all parts).
Qualified welding procedures prior to commencing production work is mandatory for standards such as AS/NZS 1554, ASME B31.3, ASME IX & others.
Contact us today regarding having qualified procedures in place before you start your next project.